Specifications include, but are not limited to: Task 1 – Data Collection and Gap Analysis The Consultant shall assess the Village’s potential compliance with the AWIA requirements based on current documents, policies, plans, procedures, and assessments it already has in place. This should include a method to indicate to what degree those current concepts meet the AWIA compliance, including completeness, currency (less than 5 years old), intent, etc. The Consultant is expected to follow all current regulations of the EPA, as well as supporting guidance documents provided by the American Water Works Association including the following: AWWA G300, AWWA G430, AWWA G440, AWWA J100, AWWA M19, etc. The Consultant shall continuously check with the EPA for any AWIA changes to the RRA and ERP requirements. Task 2 – Conduct and Develop Risk and Resilience Assessment (RRA) The Consultant shall conduct a Village-wide all-hazard Risk and Resilience Assessment, which follows the guidelines given in Section 2013 of America’s Water Infrastructure Act, which amended Section 1433 of the Safe Drinking Water Act.