Specifications include, but are not limited to: 1. Snowplowing shall commence within one (1) hour following notification by the City. 2. Snowplowing of Red Route and sidewalks shall be completed within four (4) hours following commencement of the work. Contractors are to provide enough equipment and the proper equipment to complete the tasks in a timely manner. 6 3. Plowing operations shall be continuous until the work is complete unless otherwise directed by the Public Works Division Manager. 4. Snow will be plowed from all Red Route and sidewalks as per agreed upon in the contract. 5. Plowing shall be from curb-to-curb and plowed to bare pavement. 6. No large or excessive windrows will be allowed across driveways in the Red Route or sidewalks, such determination shall be made by the Public Works Division Manager. 7. Residential driveways shall be clear of all large snow and ice boulders or chunks, allowing cars to pass through. Acceptable conditions shall be made at the sole discretion of the Public Works Department. 8. Backing into residential driveways is prohibited. 9. Stacking snow shall be done only in designated areas identified on the Snow Maps. 10. Special snow handling equipment requiring special charges above and beyond the contractor’s normal snow plowing rates shall be utilized only with the City’s prior authorization. Tandem axle dump trucks (6-wheelers) and single axle dump trucks (3- tons) are prohibited in Red Route and sidewalks unless approved by the City.