Specifications include, but are not limited to: A new sidewalk, high visibility crosswalk and way-finding signage at the entrance of Spring Street.Real time message boards on the platform to indicate train departure/arrival time and track location.Creation of a Kiss and Ride area by reconfiguring the parking drive aisle along the north side of the parking lot. Existing ADA parking stalls will be relocatedto the west to improve accessibility to the platforms. The sidewalk across theADA parking shall be upgraded and detectable warning signs be installed.Installation of bike shelters on the east side and west side of the Metra tracks.Installation of decorative monuments signs at entrance on Spring Street.Installation of shared lane markings (Sharrows) along Spring Street.Installation of commuter transit shelter (s) along with space heaters.