Specifications include, but are not limited to: 2.1 Remove top 2” of the 1932 square yard asphalt parking lot. There will be a tack coat applied and then a 2” asphalt wearing course applied with the current slopes and elevations. 2.2 Perform all off-site work necessary to meet the requirements of the project, local codes, reference standards, technical specifications and performance criteria. Identify and obtain all permits to comply with all federal, state, and local regulatory requirements associated with this work. Comply with the force protection criteria. 2.3 All material shall be installed per the manufacturer’s recommendations 2.4 Provide removal of all rock, debris and the current asphalt associated with the parking