Specifications include, but are not limited to: The Contractor shall provide all labor and materials associated with removing the existing duel grinder pumps, rails, chains and other electrical accessories. The Contractor shall install (2) submersible 5 HP. grinder pumps. The 5 HP. grinder pumps shall be rated at 70 GPM for 110 ft. of TDH, 3450 RPM, single phase and 240 V. The Contractor shall provide and install a new 48” aluminum single hatch round cover with hinged access door. The Contractor shall provide and install a 2” base elbow rail system kit for explosion proof pump system including base elbows, sealing flanges and upper and lower guide rail supports. The Contractor shall provide and install new stainless-steel guide rail pipes, stainless-steel lifting handles, stainless-steel lifting chains, and stainless-steel float mounting bracket. The current control panel Duplex (NEMA-3R) located on the concession building is functional. New pumping system shall need to be compatible with existing control panel.