Specifications include, but are not limited to: Removal of the existing asphalt pavement and replacement with 200 tons of hot-mix asphalt surface course (Mix D), 401 tons of hot-mix asphalt binder course, and 1,789 square yards of 8 aggregate base course. 185 square yards of concrete shoulder, 12 wide, will be constructed along the pavement edges. The existing driveway aprons will be removed and replaced in kind. The existing driveway culverts will be removed and replaced with ductile iron culverts, ranging in size from 12 to 16 . 17 water meter vaults will be removed and replaced, along with 667 feet of 1 ½ copper services. Small of quantities of concrete sidewalk are also included. Areas disturbed will be restored with 1,515 square yards of 4 topsoil and sod. This project is located along Grove Avenue, east of Ridge Road. The limits of construction are from Ridge Road to where the roadway dead-ends, approximately 850 feet to the east.