Specifications include, but are not limited to: Green Road has one area which will require milling and resurfacing of equal depths; an approximately 120-foot length of roadway (60-feet on either side of the center of the roadway culvert), starting approximately 2,670-feet south of the intersection at Main Street and continuing in a southwest direction. Oakleaf Drive has one area which will require milling and resurfacing of equal depths; an approximately 52-foot length of roadway starting at the intersection with Mill Street and continuing east. Nottingham Drive has one area which will require milling and resurfacing of equal depths; an approximately 48-foot length of roadway starting at the intersection with Mill Street and continuing east. Mill Road will require milling and resurfacing of equal depths for the entire length of this roadway section.