Specifications include, but are not limited to: The work consists of the construction of 700’ of 12” storm sewer along the eastbound lane of the roadway, the construction of 800’ of 8” water main along the westbound lane of the roadway, along with the installation of 7 manholes, 400’ of 1-1/2” copper water service line replacement, 100’ of 6” storm sewer laterals, and 3 new fire hydrants. 1,780 feet combination curb and gutter removal followed by installation of type M-4.12 combination concrete curb and gutter. 1,600 square yards of existing asphalt pavement will be removed and replaced with 380 tons of binder, N50, and 190 tons of warm-mix asphalt surface course (Mix “D”). The existing driveway aprons will be removed and replaced in kind. All asphalt work for this project will use warm-mix asphalt. Areas disturbed by construction operations will be restored with 585 square yards of topsoil and sod. This project is located along Ivy Lane from Sheridan Road to the east end of Ivy Lane.