This Contractor is to provide and install the following: • Supply, install and maintain all erosion, sediment and dust control BMP systems. Once this Contractor is no longer on site, erosion and sediment control systems will be maintained and removed by the Construction Manager. • Provide all survey and staking required for this work. • Demolition of existing grass field, irrigation, goal posts and goal post foundations. Cap irrigation line where indicated. • Disconnecting, capping or sealing, protecting and abandoning site utilities in place. • Saw-cutting and removal at all indicated areas including containment curbs and athletic asphalt track. • Retain and protect all items as indicated including existing athletic track, electrical vault, curbs, chain link fencing, asphalt, irrigation, storm drain utility, landscaping and light pole. Return indicated items to Owner. • Construction and removal of heavy equipment track crossing per detail 1 pg. C2.50. • Removal of existing vegetation.