Specifications include, but are not limited to:: Work includes construction or alteration of two fire stations near Priest River, Idaho. Station #3 involves the addition of approximately 1,440 SF single-story, shed-roofed, wood stud, slab-on-grade construction. Station #4 involves the construction of an approximately 3,880 SF shop building, single-story, wood stud, slab on grade construction. Site work includes clearing and removal of topsoil, excavation for building foundations, utility connections, back-fill, concrete sidewalks and curbs, asphaltic paving, and grading. Building work includes concrete foundations, slabs, wood stud and prefabricated wood truss structure, insulation, gypsum wallboard interior finishes, metal roofing, vinyl windows, hollow metal and wood doors, builder's hardware, painting and pre-finished metal siding. Electrical work includes, site utilities, electrical service, site lighting, interior lighting, exhaust fans, power distribution and devices, data conduit, and connections to Owner-provided equipment. Mechanical work includes site utilities, gas piping, waste/vent and domestic water piping, and the installation of (2) gas unit heaters at Station #4 and a split system at Station #3.