Specifications include, but are not limited to: A.Selective Demolition: 1.Removal of existing frames, doors as required accommodating new construction. 2.Protection of existing structure, materials, and equipment items indicated to remain. 3.Protect floors with suitable covering when necessary. 4.Provide temporary weather protection, during removal of exterior doors to ensure that no water leakage or damage occurs to structure or interior areas. 5.Remove existing hardware from doors and offer to Owner for first rights of refusal. Properly depose of any remaining hardware not taken by owner. 6.Upon completion of demolition work, remove tools, equipment, and demolished materials from site. 7.Repair demolition performed in excess of that required. Return elements of construction and surfaces to remain to condition prior to start of operations.