Specifications include, but are not limited to: 1. Demolition of existing front door, back door, and two (2) stairwell access doors. 2. Installation of new front door, back door, and two (2) stairwell access doors with keyless system. 3. Installation of VHI compliant intercom system at front door and parking lot door. 4. Demolition of existing security camera. 5. Installation of security cameras on all floors, lobby, basement parking entrance and lobby level parking area, along with building perimeter (to cover basement entrance to parking, upper parking area, building rear and Piikoi Street side of building). 6. Asbestos air monitoring during construction. 7. Installation of monitoring system to be located in first floor office. Monitoring system to include necessary software, hardware, and monitor for review camera footage. 8. Demolition of existing exterior lights and fixtures.