Specifications include, but are not limited to: 1. Elevator Contractor shall perform Full Operation and Maintenance Services (hereinafter referred to as the "Services" and/or the "Work") on the Elevator (the "equipment") specified herein which shall include preventive maintenance services. All equipment under this Contract shall be maintained in first-class operating condition. Elevator Contractor shall furnish all materials and labor, and comply with all requirements of current elevator Codes. Elevator Contractor shall place into operation a continuing system of Full Preventive Maintenance to provide necessary systematic services and preventive maintenance for the Elevator equipment described herein. 2. The Elevator Contractor shall be responsible for providing safe and reliable operating elevators in the performance of this contract. The Elevator Contractor shall not be excused from elevator shut downs allegedly caused by “FAULTY or DIRTY” building incoming electrical power unless the contractor provides competent data from the electrical power company or other credible independent source to confirm the building electrical power supply caused the elevator shut down /problem. The data shall be submitted, in writing, to the HPHA no later, than 14 calendar days following the electrical occurrence, allowing the HPHA to submit timely cost reimbursement claims to HECO. Elevator Contractor invoices for electrical power related elevator shut downs/problems shall be invalid in the event the required electrical data is received by the HPHA past the allowable date limit prescribed above.