Specifications include, but are not limited to: 1. 1 LS Demolition of all items as indicated on the Drawings, inclusive of pumping out and disposal of the contents of the existing Preloader Tank, Aerobic Sewage Tank, and cesspools, backfilling the tanks and cesspools with 500 psi CLSM, removal of all manholes and access manways for the tanks and the cesspools, removal and demolition of the cesspool concrete covers, all incidental demolition and restoration work and materials, complete. 2. 1 LS Installation of Preloader Tank, Aerobic Treatment Unit, and Absorption Bed, inclusive of excavation and backfill, Absorption Bed piping and leaching chamber, sewer piping, all incidental and appurtenant work and materials, all incidental restoration work and materials, in-place, complete (Hapuna Concession Building). 3. 1 LS Installation of Septic Tank, and Absorption Bed, inclusive of excavation and backfill, Absorption Bed piping and leaching chamber, sewer piping, all incidental and appurtenant work and materials, all incidental restoration work and materials, in-place, complete (Hapuna Baseyard Building).