Specifications include, but are not limited to: Work with OHA to plan, design and permit and entitle (including EA/EIS) a Water Storage Tank, Realign the ADC pipe (in collaboration with the Agribusiness Development Corporation) on OHA’s 511-acre property. A. Conceptual Design Phase 1. This will require the understanding and the ability to envision where two (2) - 1- million-gallon storage tanks are to be located and the existing (ADC) water distribution pipe and riser is envisioned to be relocated on the 511-acre property. The storage tanks are being constructed to receive up to 1 million gallons of water per week from the ADC pipe via the riser that comes from ADC’s well that is not located on the 511-acre property. a. The tanks should be able to operate independently to allow for continuous service while maintenance is being performed to ensure 100% reliability, 100% of the time. The tanks should also be able to be controlled to accept water when necessary by the OHA or its designee without being on site. b. Additionally, ADC’s pipe traverses the OHA’s property and continues on to other portions of ADC’s property where it delivers water to other sources. (See attached map for preliminary locations of the tank and potential relocation alignment of the ADC pipe and riser). 2. Requires the review the OHA’s Conceptual Master Plan for the property and understand the purpose of and concerns with developing a water storage tanks in the envisioned location of the OHA’s 511-acre property.