Specifications include, but are not limited to: 1.Research and evaluate the proposed crash test article prior to the construction of the crash test article for potential problems or improvements or the potential for participation in a pooled fund study.2.Construct the proposed/modified crash test article.3.Crash test of the crash test article in accordance with the appropriate test and test level ofMASH 2016, including all applicable documentation as required.4.Prepare a crash test report of the results including an evaluation of whether the testarticle would be eligible for FHWA participation.5.For unsuccessful crash test prepare an evaluation and make recommendations for changes which could be made to the test article to increase the likelihood of a successful crash test.6.Note that this contract will include the crash testing of multiple different articles contingent on sufficient funding remaining in the contract. The test articles may range from bridge guardrails, guardrail transitions.