Specifications include, but are not limited to: The Contractor shall mobilize all necessary equipment and tools to complete this project as soon as possible after award of the bid contract and issuance of Notice To Proceed. The Contractor shall provide a submittal for the new pump to the DOW for review and approval with the proposal; The DOW will disconnect the deep well motor cables at the motor’s junction box and disconnect the pre-lube piping as needed. The Contractor shall remove the deep well pump assembly unit consisting of: a pump discharge head assembly; 280.75 feet of 6” diameter pipe column and combination couplings with Neoprene bearings; 280+ feet of 1-3/16” 316 stainless steel line shaft,shaft sleeves and couplings; druck water level probe;Floway 8JKH pump bowl assembly with strainer; and a 50 horsepower US Electric, 3 phase, 460 volt hollow shaft vertical electric motor (motor to be placed on pallet for DOW Operations Division).