Specifications include, but are not limited to: A.The contractor shall provide all new parts, labor, materials, tools, testing and qualified professional to install new UPS located in the Airports Division Drafting Section Reproduction Room. B.Contractor is responsible to have the new unit at current firmware versions or Eaton recommended firmware versions. C.Contractor will work with the Airports Division Information Technology Office, also known as AIR-I, prior to the installation of the new units. D.Contractor shall assemble UPS.E.Contractor shall meet with Airports Division Oahu District Maintenance Electricians regarding the power disconnection of existing Powerware 9170 12kVA UPS and what is needed in order to power the new UPS. F.Contractor shall remove any packing materials that is delivered with the new UPSs.G.AIR-I is responsible to dispose of the existing units and any materials that are removed.