Specifications include, but are not limited to: Providing material, labor and supervision to furnish and install a running track surface at West Laurens High School. The scope includes the following: utilize existing curbs, drains and asphalt; strip, pressure wash and prime existing painted track surface; fill all small cracks, bird bath depressions and irregularities in existing surface; install approximately 5,300 syd of new track system on 8-lane track, long jump/pole vault runway/pad, and high jump pad; and paint lane lines and event markings for relevant high school competition. The track should consist of a single layer 13mm permeable black mat track system consisting of SBR rubber granules bound in urethane or any system of equal quality, durability and warranty.