Specifications include, but are not limited to: The work to be done shall consist of furnishing all equipment and materials and performing all labor necessary to construct new sludge dewatering building and retaining wall and install sludge dewatering equipment including belt presses, polymer systems, polymer storage tank, sludge pumps, conveyor system, and overhead crane system. Work also includes demolition of existing sludge pump station, removal and replacement of gravity thickening equipment, concrete paving, yard piping, stormwater piping, electrical, mechanical, piping, valves, coatings, earthwork, NPDES monitoring, erosion and sediment control, mobilization/demobilization, bonds, insurance, and all other appurtenances necessary for completion of the work.