Specifications include, but are not limited to: This work shall consist of all materials, labor, equipment, traffic control, side trimming, random clearing, debris removal, and incidentals for the project. The scope includes side trimming all overhanging limbs and canopy between the roadway and the established tree line. Isolated trees and groups of trees between the roadway and the established tree line shall be removed. Removal shall be both horizontal and vertical, clearing away all overhang as well. The Engineer may reduce the lateral width of clearing, the limits of disturbance, or removal of trees or landscape at his/her discretion. If fifty (50) percent or more of a tree is removed in side trimming and the base of the tree is entirely within the limits of GDOT right of way, the entire tree shall be removed. Hazardous and leaning trees shall be removed at the discretion of the Engineer. Only in locations approved by the Engineer will disposal of wood chips or mulch be allowed at no more than 3 inches in depth. Debris shall be removed in urban and residential areas.