Specifications include, but are not limited to: The scope of work will include Sweeping Operations – District 7 along interstate and state routes within areas identified herein. This includes mechanical sweeping of highway shoulders and bridge decks and accumulated debris collected on top of level structure on shoulders, medians, ramps, and bridges. Work under this RFQ consists of furnishing all labor, materials, tools, equipment, means of transportation, and incidentals necessary to perform the services. Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel. The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Sweeping Operations – District 7 at such time, and at such location(s) as per these specifications and/or as directed by the Engineer. Prior to start of work, Engineer must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose. The Contractor will also be responsible for all traffic control in compliance with current MUTCD standards, licenses, and permits required to satisfy the duties required herein.