Specifications include, but are not limited to: 1.1.1 Remove the existing sealants from stair towers, and discard. 1.1.2 Remove the existing sealants from glazing at stair towers, and discard. 1.1.3 Remove the existing elastomeric traffic coatings, and sealants, from upper deck and discard. 1.1.4 Remove all existing Deck Drain Strainers, and store for re-use. 1.1.5 Remove and reset, or lift all mechanical equipment to recover decking with traffic coatings. 1.1.6 Furnish and install new Traffic Coating system and sealants, as specified herein. 1.1.7 Furnish and install new Pavement Markings, as specified herein 1.1.8 Furnish and install new sealants at glazing, as specified herein and shown on drawings. 1.1.9 Furnish and install new sealants at stair towers, as specified herein and shown on drawings. 1.1.10 Furnish and install paint at roofing metals.