Specifications include, but are not limited to: a. Survey existing facilities and systems to determine the optimal system configuring for the existing conditions. b. Perform energy modeling and glass selection consultations to provide qualitative data for glass choices. e. Prepare interior space to prevent damage to anything beneath skylight structure to include users of the space as well as trees and plants. f. Take measures to maintain waterproof area of work throughout duration of the project. g. Demolish existing skylight system. h. Haul away and legally dispose of all debris generated by the performance of this work. i. Install new skylight system, to include new flashing, insulation, and sealants as necessary to ensure proper function of and integration with existing roof. j. Properly observe, organize, and administer all work on site.