Specifications include, but are not limited to: restoring the existing revetment back to the crest elevations and slopes of the original design template. All stone and rocks within the existing revetment footprint will be reused to the extent practical. Smaller stone will be used as base/core stone or chinking to fill voids, while any available larger stone may be re-incorporated into the armor layer. The majority of the armor material will need to be procured by the Contractor and delivered to the site for placement in the Design Template. Existing stone within the proposed maintenance template shall only be moved/restacked to the extent necessary to recreate the original design template. No regrading of existing rock is permitted seaward of MHW, other than new rock required to build the Design Template. All work shall occur on or landward of the existing revetment, with materials delivered from land.