Specifications include, but are not limited to: This project consists of a 28,452 GSF, 2-story addition at the northeast corner of the site. The Addition is conventionally framed structural steel with shallow spread reinforced concrete foundations, first floor concrete slab on grade with second and attic floors of concrete over acoustical metal form deck. Roof structure is structural steel trusses, purlins. Roofing is standing seam metal roofing over insulation system. Exterior cavity walls consist of brick and split face CMU veneer with CMU back-up. Exterior doors and windows are aluminum. Windows are fitted with solar shade canopies and baffles. Interior partitions are a combination of glazed CMU, painted CMU and gypsum board over metal framing. Finishes include LVT flooring, resinous flooring, paint and acoustical tile ceilings and clouds. Architectural steel stairways and elevator. HVAC system consists of water source heat pumps with central plant and cooling tower, DDC control system. Plumbing system with wall and floor mounted fixtures, electronic flush valves and faucets. Fire protection wet system over first and second floors and attic. Electrical systems include lighting, power, intercom, fire alarm, data/communications, lighting controls, emergency generator.