Specifications include, but are not limited to: The project will include the construction of a sanitary sewer force main as shown in the drawings. The force main to be constructed for this project will start at Dalton Utilities Riverwater Treatment Plant Lift Station and end at an existing manhole in the Coahulla Creek Estates subdivision as shown on the plans. This includes but not limited to installing a 6-inch HDPE force main, approximately 7,500 linear feet in length. The project will also consist of a Jack and Bore for the force main beneath the Lower Dawnville Road and beneath Coahulla Creek both with casing pipe and the installation of air release valves as shown in the drawings. Dalton Utilities will supply the HDPE pipe, casing pipe and gravel for the project.