Loading...
Skip to main content
< Back to results

Residential Roofing Repair


Location
Georgia
Publication Date
10/07/2019 07:35 AM EDT
Closing Date
10/17/2019 12:00 PM EDT
Issuing Organization
City of Macon/County of Bibb
Solicitation Number
Description

Specifications include, but are not limited to: Remove all roof covering material down to roof sheathing or furring strips. Remove all debris to legal dump site. Take precautions to protect plants, shrubs, trees and fences from damage during removal. Replace up to 30% of any rotten, badly warped or broken roof decking and nailers. Materials shall match remaining material as closely as possible. Call Program Administrator for compliance inspection. Install 15 lb. asphalt saturated felt and new 220 lb. or heavier Class A three tab fiberglass self-sealing strip shingles on top of roof decking using 8 nails per shingle. Install starter course at edges of roof. Shingles to have a 20 year limited manufacturer’s warranty. Install metal flashing tucked behind siding at intersections of roof and walls. Install galvanized metal flashing tucked securely and at least ½”into masonry units of chimneys. Program Administrator will select color. Install continuous metal ridge vent along ridge lines of roof. Stop vents 18” from end of ridge line or from intersections of ridge lines. Make sure decking at ridge line is cut back at least 1” from edge of ridge pole so that the attic can ventilate.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids