Specifications include, but are not limited to: Removal and Replacement of Acrylic Glazing on four (4) each Entrance Canopies s located on the level 2 Savannah Airport Commission Terminal Facility. 4.2.1 Provide a safety barrier, approved by the Commission, around the exterior of the job site. Only one (1) canopy will be completed at a time. 4.2.2 Remove top extruded aluminum cover and mullion, acrylic glazing and seals. All existing acrylic glazing, seals, and debris from the removal must be removed from the premises daily. Extruded aluminum cover and mullion to be cleaned and set aside for reuse. 4.3.1 Provide new acrylic glazing and glazing seals for all four (4) entrance canopies. Bidder to provide detail specifications all material being provided. 4.3.2 Prior to installation of new acrylic glazing and seals, clean dirt, debris, mildew, etc. from all weep holes, aluminum frames etc. that may affect seal. Notify Commission of any existing metal, which may need immediate replacement that will prevent proper seal prior to installation of glazing. 4.3.3 Install new seal, new acrylic glazing, cleaned aluminum mullion, and extruded aluminum cover as per attached Commission drawings A4.23 and A4.24. 4.3.4 Clean up job site area and remove barriers and relocate to the next canopy to be completed.