Specifications include, but are not limited to: 1.Full depth reclamation of the existing in-situ asphalt pavement 2.Re-grading of the reclaimed base, between existing concrete gutters, to a standard crown of 2%, sloping to either side, as the typical section, to accommodate a new asphalt pavement section as follows: 10 in depth reclaimed base, 2 in binder, 1.5 in topping The reclaimed base, binder and the topping shall be placed flush with existing gutters. An allowance of +1 inch above the existing gutter is allowed for improved ride-ability. 3.Application of thermoplastic traffic stripe and pavement markings, and raised reflective pavements markers, including double yellow centerline, white edge line, stop bars, arrows and symbols, and GDOT standard, ladder type crosswalks. 4. Ingress and egress shall be maintained at all times to adjacent properties. 5. It shall be the contractor’s responsibility to furnish suitable borrow material for the project and to dispose of any unsuitable or waste material.