Specifications include, but are not limited to: Division I – Metering Station and Jack & Bore Under Dean Forest Road: The proposed work for Division I consists of connection to the existing City of Savannah 24-inch I&D water main, jack and bore 36” steel casing under Dean Forest Road and construction of new municipal water metering station within Prosperity Drive Right-ofway. Division II – Water Main along Prosperity Drive to McCraney Property: The proposed work for Division II includes installation of approximately 1,800 linear feet of 18-inch water main along Prosperity Drive between new metering station and McCraney property line as indicated in the construction plans. Additionally, Prosperity Drive road and storm drainage improvements are part of the Division II. Division III – Water Main from Metering Station to Airport Park Drive: The proposed work for Division III includes jack and bore 30” steel casing under prosperity Drive and installation of approximately 1,000 linear feet of 16-inch water main along Dean Forest Road between Prosperity and Airport Park Drives.