Specifications include, but are not limited to: This contract consists of adding 2 ft. Widening and 4 ft. Earth Shoulder Filling on Left and Right of the roadway on SR 107 in Irwin and Ben Hill Counties. The project begins 345 Ft. East of Irwin/Turner Co. Line at Log Mile 0.00 (Irwin MM 0.06) and ending at JCT of Irwinville Hwy LT. and SR 125 RT., Log Mile 10.035 (Ben Hill MM 2.4). Begin Indentation Edge Line Rumble Strips Ground in Place (Continuous) LT. and RT. refurbish the Center line & Edge Lines with Thermoplastic Striping; Remove Existing RPM’s and Replace the RPMs after the Paving and ELRS operations are complete. Temporary and Permanent Grassing will be required on 4 ft. Earth Shoulder Filling. Attached are the Typical Section notes for 2 ft. Asphalt Shoulder Widening, 4 ft. Earth Shoulder Filling, General Notes, Mile Log, Estimated Quantities, Detail for Asphalt Shoulder Widening, Detail for Earth Shoulder filling and Map that apply to this contract.