Specifications include, but are not limited to: Providing all labor, materials and equipment necessary for construction of the New Boyd Road Sanitary Sewer including of 390 feet of 10-inch DIP, 5 Manholes, and 295 feet of jack and bore 18-inch steel casing pipe. The bore pit is anticipated to need sheeting and shoring.The Project has tight constraints and the Contractor (sub-contractor) must possess the ability and appropriate equipment to jack and bore through rock, and the ability to control surface settlement and heave above the pipeline to prevent damage to utilities, facilities and improvements through their methods and equipment. Part of the review process for submitted bids will be qualifications and equipment to be used for the jack and bore.