Specifications include, but are not limited to: Lawrenceville South Lawn Underground Feeder Cable and Padmount Switchgear Installation. Install three phase 1000 kcmil primary underground cable in 6 inch conduit. Install 6 inch schedule 40 PVC conduit. Install and make-up three phase PME-9 deadfront switchgear on 24 inch deep fiberglass groundsleeves. Terminate three phase 1000 kcmil cable in switchgear and at pothead poles. Material and equipment will be installed to City and ECG specifications. • All work shall comply with all Federal, State, and local requirements and specifications. This Section includes regulations pertaining to some important issues related operations, including, however but not limited to all construction activities prior to or during construction unless otherwise shown for items somewhere in this document, this section will prevail. • All material will be provided by the City of Lawrenceville.