Specifications include, but are not limited to: The project is located on St. Marys Street West at the end of Wheeler Street next to the Cumberland Queen Ferry Doc – National Park Facility more specifically at GPS Coordinates: 30°43'12.61"N 81°33'0.90"W. The project will consist of the construction of two new reinforced concrete boat ramps, a new floating boat launch facility, and a new transient boat floating dock with kayak launching and recovery components Even though demolition of the old boat ramp is completed, the Contractor will dispose of additional debris off site in compliance with all local, state, and federal laws and regulations. The Contractor will be responsible for verifying existing conditions, identifying all conflicts, furnishing all materials, equipment and labor for successful completion of the project. The Contractor will deliver a high-quality waterfront facility to allow public access to the water from Wheeler Street.