Specifications include, but are not limited to: Furnishing all labor, equipment and materials necessary to complete the mechanical and electrical improvements shown herein including, but not limited to, ithe following: Merle Manders Conference Center-Install a 4 pipe hydronic cooling and heating system-40 ton chiller, gas fired heating water boiler, air handling unit(s), new ductwork, chilled water piping, hot water piping, modifying existing electrical panels, boxes, switches, receptacles, and all related appurtenances to make the project complete. City Hall-Remove three (3) condensing units (15, 25, and 40 tons), installing an 80 ton air cooled water chiller (with scroll compressors and integrated water pumps). Replace three (3) DX cooling coils in the AHUs with three (3) cooling coils. Modify/install electrical panels, boxes, installing receptacles and switches, and all related appurtenances to make the project complete. Municipal Court Building-Installing a 2 split system dehumidifier systes, each consisting of one (1) indoor dehumidifier air handling unit and one (1) outdoor condenser installing indoor dehumidifier unit, installing supply and return ductwork, installing ceiling diffusers and dampers, installing floor openings and return grilles, modifying existing ductowrk, installing refrigerant and condensate lines, installing humidity control units for each system, installing a concrete pad and enclosure for outdoor unit, installing fencing around outdoor unit, modify/install electrical panels, boxes, installing receptacles and switches, and all other related appurtenances to make the project complete.