Specifications include, but are not limited to: Construction of approximately 0.41 miles of sidewalk/multiuse
path (sidewalk varies 5'-8') along the "northern" side of Hardscrabble Road from Etris
Road to Rucker Road. Phase 1-Etris Rd to Crabapple Rd. Phase 2-Crabapple Rd to Rucker Rd.
This project will provide pedestrian connectivity from Etris Rd to Rucker Rd along the
"northern" side of Hardscrabble Rd. Project elements include but are not limited to
maintenance of traffic, earthwork, erosion control, concrete work (sidewalk, curb and gutter,
ramps), and stormwater installation.