Specifications include, but are not limited to: Qualified contractors for services for engineering design and construction overview services for Georgetown sewer improvements. The Lift Station 176 16 inch force main shall be extended approximately 10,250 linear feet. The new force main shall extend from end of line at Henderson Lake to a tie-in point at Lift Station 126 as shown on the attached Exhibit 4. It is proposed that the project be constructed inside the City’s existing utility easement. Where this is not possible, the proposed force main shall be placed in public rights of way, other utility easements, or private properties (City or County right-of-way or drainage easements, Georgia Power, etc.). Thus, plat preparation and utility application preparation services shall be included in the project and the City will handle the property acquisition process. As part of this project, Lift Station 193 shall be investigated due to the proposed extension as well as Lift Station 26 in the event the flow is reversed from Georgetown to Southwest Quad.