Specifications include, but are not limited to: The Contractor shall supply materials, labor, tools, plant, supplies, equipment, transportation, superintendence, temporary construction of every nature, and other services and facilities necessary to complete the construction of the described facilities, including, but not limited to, incidental work described in the Contract Documents. Perform designated demolition as indicated and as required for installation of new mechanical equipment system. Provide one (1) new Air Handling Unit to provide conditioned heating and cooling to the existing Gymnasium Facility. Provide all necessary infrastructure including ductwork (metal and fabric), electrical and natural gas piping. Replace removed existing exterior metal wall panels and interior metal liner panels and insulation with new metal panels matching existing panel profiles and finish.