Specifications include, but are not limited to: 1. The contractor shall furnish all labor, equipment, materials, and perform all operations necessary to install, repair, remove, recycle, or dispose of carpet and other flooring materials. 2. The MCSD will only accept Shaw Interplay Broadloom carpet for all areas where rolled carpet is specified, Shaw Diffuse and Disperse for all areas where carpet squares are specified, Armstrong VCT for all areas where VCT is specified and 20 Mil LVT where LVT is specified. 3. The contractor shall take all steps necessary to prevent damage to walls, doors, and equipment 4. The contractor(s) shall furnish project drawings indicating seam direction (on roll material); outline heavy use areas and walkways within ten business days after site visit at no additional charge to the customer. The contractor(s) shall provide a professional recommendation on product layout, walk-off mats if required, and make recommendations in writing to ensure sustainability practices are known at no additional charge to the Customer. 5. The contractor(s) shall be responsible for physical measurements at no additional cost to the customer, and is responsible for the accuracy of the measurements and the fit of the work. The contractor(s) will be required to provide cost estimating diagram services at no additional charge to the customer. 6. The contractor(s) shall protect carpet and flooring materials against damage and soiling from construction operations and placement of equipment and furnishings during installation. This shall include but not be limited to; providing caution tape and barriers to keep normal traffic off of floors during installation until the area is turned over to the occupant. This does not include permanent protection.