Specifications include, but are not limited to: The Enrollment Center will be a campus gateway and information center. It will fulfill the objective of simplifying admissions, enrollment and the registration process for prospective students so they become fully engaged students leading to graduation. This center will support students from their first contact all the way through to graduation. ; The project consists of the construction of an approximately 8,300 square foot . ; (i) Develop a major task based bar schedule (Gantt chart). (ii) Complete the design process and produce construction documents (iii) Develop a provisional construction CPM schedule indicating methods and sequencing of construction. (iv) Develop requirements for safety, quality assurance, and schedule adherence. (v) Perform a “constructability” review of the construction documents. (vi) Perform maintainability review of the construction documents. (vii) Provide detailed construction cost estimates, to achieve GSFIC’s budget. (viii) Provide analysis of different construction methods in each major trade group for potential quality, cost, and schedule enhancements. (ix) Develop construction budget to be maintained throughout construction. (x) Develop value-engineering options.