Specifications include, but are not limited to: Influent Junction Box Improvements • Survey and elevation analysis • Preparation of drawings necessary for construction to include a plan and profile that indicates pipe route, size, and valve & appurtenance locations in relation to adjacent existing property lines, right-of-ways, structures and utilities in compliance with all applicable state, local and JWSC Standards. • Details of any conflicts with other utilities • Construction details • Erosion Control plans & specifications required for construction • Quantity takeoff and Opinion of Probable Cost • Technical Specifications • Design calculations as necessary to verify pipe sizing, elevations, & specifications. • Abandonment of existing junction box structures. • Secure and coordinate with Geotechnical as necessary.