Specifications include, but are not limited to: SCOPE OF WORK 1. Disconnect and remove electrical/data/phone cable wiring to existing built in millwork intake desk and cubicles, 2. Demolish, remove and dispose of existing built in millwork intake desk and cubicles, 3. Remove existing vinyl tile and carpet flooring in intake desk and cubicle area as needed to facilitate the installation of new flooring to include Vinyl floor tile and carpet to transition under the planned foot print of new modular furniture supplied by others, see diagrams attached for reference. 4. Install new rubber cove base as needed in affected areas to match existing. 5. Patch, mud, sand finished ready for paint any wall surfaces damaged, discolored or otherwise unacceptable in work area. 6. Paint walls in work area, corner to corner, floor to ceiling, to be evenly coated a color to be specified by the owner. 7. Install new electrical/data/phone wire and cabling and make final electrical connection and Phone/data cable terminations to new modular furniture to include the following for each work station (5). a. One dedicated 120v 20a duplex outlet, (Orange) b. One un-dedicated 120v 20a duplex outlet, (brown) c. One Phone outlet port d. One Data cable port 8. Install new lockable half door and frame in between new modular furniture and wall. Door finished laminate and locking hardware and device to be specified by owner.