< Back to results

Culinary Kitchen HVAC Replacement

Delivery Location
Publication Date
12/29/2017 11:23 AM EST
Closing Date
01/17/2018 09:00 AM EST
Issuing Organization
Gwinnett Technical College
Solicitation Number

Specifications include, but are not limited to:  Remove 15 ton condensing unit from roof  Remove 15 ton AHU from kitchen ceiling cavity  Furnish/Install (1) new 15 ton AHU with electric heat in ceiling cavity  Furnish/Install ductwork connections and insulation as required to reconnect to existing ductwork  Disconnect and reconnect of refrigerant lines, electrical and controls  Reuse existing controls  Reuse existing refrigerant lines  Furnish rigging and lifting required for HVAC equipment  Provide permit fees for HVAC  Provide startup and 1 year parts and labor warranty for new equipment  Provide Operation and Maintenance Manuals  Furnish/Install (1) new 15 ton condensing unit relocating from roof to ground o Run new refrigerant lines to new location o Run new electrical service to new location o Run new control wires to new location

http://ssl.doas.state.ga.us/PRSapp/PublicBidNotice?bid_op=188320083200-GWT0000030 (opens in a new window)

Get instant access

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations


Matching bid notifications & access to all Statewide & Group bid details


Matching bid notifications from participating agencies


Access participating agency bids