Specifications include, but are not limited to: Part A: Locating, uncovering, and raising approximately 100 manholes. Clearing all existing crosscountry sewerline right-of-way, approximately 12,600 L.F. Part B: Approximately 12,100 L.F. of 8-inch sanitary sewer line evaluation via cleaning and CCTV inspection Part C: Rehabilitation of 8-inch sanitary sewer lines based on evaluations from Part A. Pipeline rehabilitation will include approximately 1,970 L.F. of cured-in-place-pipe. All work includes associated items such as but not limited to point repairs, lateral reconnections and replacement, pavement cut and repair, and manhole connections. Part D: Rehabilitation of manholes based on evaluations from Part A and those manholes already noted for rehabilitation on the project plans. Includes the rehabilitation of approximately 60 manholes via coating with 100% calcium aluminate cementitious coating. Work also includes clearing of gravity sewer line right-of-ways for line and manhole access, chimney seals, invert reconstruction, ring and cover replacement, grouting of manhole riser seams, and other miscellaneous manhole repairs.