Specifications include, but are not limited to: 3.4 Basis of Design The Design Team shall develop and submit a Basis of Design (BoD) document to the owner detailing how the design will meet the OPR. The CxP shall review the BoD in coordination with the owner in accordance with ASHRAE Standard 202-2013, Article 8.2.3. 3.5 Design Reviews 3.5.1 CxP Reviews The CxP shall review documents produced by the Design Team to confirm consistency with the OPR and ensure commissionability, completeness, cost-effectiveness, accessibility, coordination of trades, maintainability, and energy efficiency. The CxP shall provide review comments to the Owner and Design Team. The CxP shall review the documents at the following stages: Schematic Design Design Development 50-80% Construction/GMP Documents 100% Construction Documents The CxP shall back-check all previous comments at each stage as well as review new/revised content.