Specifications include, but are not limited to: A. Scope of demolition and removal work is shown on drawings. B. Project lay-down area and access shall be coordinated with College of Coastal Georgia during pre-construction meeting. Provide pallets to protect concrete/asphalt from heavy or sharp edged equipment. Utilize a double-lock hasp lock in conjunction with College of Coastal Georgia to secure lay-down area. C. Protect floors inside the building along the path of access and construction with rubber mats. Protect doors, door jams and facings, building corners, and other exposed edges with Ramboard-style coverings. D. Remove existing laboratory fume hoods. Keep existing bases intact. E. Provide new fume hoods on existing bases. F. Make all final duct and utility connections to the new fume hoods. G. Test and Balance the new fume hoods.