Specifications include, but are not limited to: All wood areas including soffits, trim, painted hand rails (powder coated and anodized aluminum railings are to be washed only), painted doors, jambs and brackets, will be included as well as stucco areas on exterior of building and stucco on fence columns shall be painted. Contractor to caulk, fill and seal all cracks, holes and dings in building stucco or trim. Contractor shall scrape, clean and remove all flaking, peeling and loose paint. Contractor shall protect all areas that are not to receive paint. Drop cloths, plastic and canvas covers will be used to protect shrubbery using caution not to damage landscaping. Contractor shall mask off windows, doors and non-painted brick, cast stone, etc. Windows to be caulked around and all cracks filled in this project. Contractor to clean all gutters of trash and debris and mark any clogged down spouts with flagging tape. Contractor to protect all hardscape and landscape elements with tree mats provided by owner or plywood for access to job for lifts or other equipment. Where caulk is missing and loose at various horizontal cast stone joints on buildings and fence, fill with SW Loxon 1K smooth elastomeric urethane caulk.