Specifications include, but are not limited to: The work to be performed shall include but is not limited to the removal of approximately 102 linear feet (LF) of 36” corrugated metal pipe (CMP), approximately 76 LF of 24” corrugated metal pipe, 2 existing headwalls, water line relocation, relocation of existing gas line, relocation of underground telephone line, securing an existing power pole during construction, and removal of pavement. The Project will also include the installation of approximately 60 LF of triple 48” by 76” elliptical reinforced concrete pipe (ERCP), approximately 38 LF of dual 36” reinforced concrete pipe (RCP), 4 headwalls with aprons, water line, four 8” 45˚ Bends with thrust blocks, two 8” gate valves, along with landscaping and grading and erosion control associated with the installation of these items. The work will be installed in Douglas County and the neighboring areas adjacent to Cedar Mountain Road by open cut methods as required and shown on the plans and specifications for the Cedar Mountain Road Stormwater Improvement Project, prepared by Rindt-McDuff Associates, Inc., Roger Cox, P.E., dated November, 1, 2019.