Specifications include, but are not limited to: Provide all labor, materials, and equipment for the culvert replacement project at Ebenezer Road. Work will generally include removal of an existing 60” corrugated metal pipe, installation of a 29’ wide x 5’7”tall Contech Con/Span precast bridge system, installation of other drainage structures, and construction of roadway improvements, as depicted in the construction plans. Additionally, provide all necessary purchasing, coordination, supervision, mobilization, traffic control, erosion and sedimentation control, construction staking, demolition, removal, disposal, utility protection and relocation, clearing, grubbing, excavation, grading, compaction, paving, marking, cleanup, and other services required for the project.